
A commercial buyer usually orders an ALTA/NSPS Land Title Survey after the purchase deadlines have already started. The survey order includes a list of optional items from Table A, and that list decides how much the finished survey will show. Deciding which ALTA survey requirements to pull from Table A comes down to three things: your purchase agreement, your lender’s requirements and your plans for the property after closing.
Table A is a menu of extra survey tasks that go beyond the standard’s minimum requirements. Your surveyor completes the minimum work on every ALTA survey, but a Table A item only gets done when someone asks for it. The current rules are the 2026 ALTA/NSPS standards, which took effect on February 23, 2026, and replaced the 2021 version. Settling your list early gives the surveyor a clear scope and keeps the survey from turning into a late surprise.
Start With the Purchase Agreement and Lender’s Survey Conditions
Your first Table A guidance is usually already in your deal file. Many commercial purchase agreements spell out the type of survey the buyer must get and when it’s due. Some list specific Table A items by number. Pull that language before you call a surveyor, because the contract sets the minimum for your order.
Your lender is the second source. Commercial lenders often send a survey requirements sheet or a standard list of Table A items they expect on every loan. Some also want the survey certified to the lender’s successors and assigns, and the 2026 standards allow that wording when it’s requested. If your lender’s checklist still uses the 2021 item numbers, ask for an updated version. The 2026 standards added a new Item 20 for an encroachment summary table, and that moved the catch-all item for custom requests to Item 21.
Bring the title company into this step as well. The surveyor needs a current title commitment, and the title insurer may need certain survey details before it will change the policy’s survey coverage. A quick question to the title officer at the start can prevent a revised survey order later.
Match Table A Items to Planned Property Use
Once you know which items are required, look at your plans for the site. A buyer keeping an existing building as it stands needs different details than a buyer who plans to expand or redevelop. Your Table A list should reflect what you’ll actually do with the property.
Here’s how planned use often points toward certain items:
- If you’re keeping the building as it stands, building dimensions and footprint area (Item 7) and parking space counts (Item 9) help confirm the property matches the leases and the listing.
- If you plan to add onto the building or pave more area, contours or spot elevations (Item 5) and utilities (Item 11) give your engineer a starting point.
- If you’re changing the use, zoning setbacks and height limits (Item 6) show how existing improvements sit against the rules, once you supply a zoning report.
- If you suspect neighbor conflicts, the encroachment summary table (Item 20) puts observed encroachments into one organized list.
Don’t order every item just because it’s on the menu. Extra items add field time and drafting time, and some won’t change your decision at all. Talk through your plans with the surveyor so the list fits the deal in front of you.
Identify Which Optional Details Require Additional Coordination
Some Table A items depend on information the surveyor can’t produce alone. Item 6 is the clearest example. The surveyor shows zoning setbacks, height limits and similar rules only when the client provides a zoning report or zoning letter. You’ll need to order that report from a zoning consultant or request a letter from the local zoning office before the surveyor can finish the item.
Utilities under Item 11 also rely on outside help. The surveyor may combine what’s visible in the field with utility plans and locate markings. Utility locate requests in Illinois go through a one-call system, which is JULIE for most of the state and a separate system inside Chicago. The survey timeline can depend on how quickly those requests and the utility owners’ records come back.
Requests that don’t fit any listed item go under Item 21. Custom requests can include building heights, protected airspace near an airport or internal tax parcel lines on a multi-parcel site. The 2026 standards label each one as 21(a), 21(b) and so on. Write these requests out in plain terms so you and the surveyor agree on what the final map will show.
Evaluate Table A Costs Against the Purchase Timeline
Each item you add can change both the price and the delivery date. Contours across a large industrial lot take more field time than measuring a single building footprint. Items that wait on other people, such as a zoning report or utility records, can delay the final drawing even after the field crew is done.
Line up the survey schedule against your contract dates. Look at the end of your due diligence period, your deadline for title and survey objections and your planned loan closing. If the survey arrives after the objection deadline, you may lose the chance to raise a problem it reveals.
Ask your surveyor which items have the biggest effect on time and cost. Some details your engineer needs for design work can wait until after closing and come from a separate topographic survey. Other items, like those your lender requires, can’t be dropped. Sorting your list into “needed before closing” and “needed later” helps you keep the survey on schedule.
Confirm the Selected Items Before Authorizing Survey Work
Put your final Table A list in writing before the surveyor begins fieldwork. The engagement letter should reference the 2026 ALTA/NSPS Land Title Survey standards by name. It should also list every Table A item you’ve chosen, including any adjusted wording and each Item 21 request.
Check the certification block before you sign. The buyer’s name should match the exact legal entity taking title, which is often an LLC formed for the purchase. The lender, the title company and any other party relying on the survey should appear as well.
Send the final list to your lender and title officer for a quick review. Changes made after fieldwork usually cost more and take longer than changes made at the start. A surveyor licensed can walk through the list with you and point out anything that doesn’t match your deal documents.
Frequently Asked Questions
Are all ALTA Table A items mandatory for commercial purchases?
No. Table A lists optional survey tasks that a client chooses to add. A specific item can become required in your deal when your lender, title insurer or purchase contract calls for it, or when a law that applies to the property requires it.
Can a buyer request only certain portions of a Table A item?
Often, yes. The Table A wording can be negotiated between the client and the surveyor, so a buyer might narrow an item to fit the deal. Any adjusted wording should be written into the signed survey agreement so everyone reads it the same way.
Does Table A Item 6 replace a separate zoning report?
No. Item 6 depends on zoning details that the client gives the surveyor in a report or letter. The surveyor then shows how the property compares to those details on the map, but the survey itself doesn’t research or interpret the zoning code.


